Browse all practice questions for the Qualified SWPPP Practitioner and Developer (QSP/QSD) Practice Test. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Ace the QSP/QSD Challenge 2026 – Storm into Success with SWPPP Savvy! course image
All questions

These questions are part of the practice quiz. Start practicing

  • DWQ-2009-0009 regulates storm water discharges from?
  • Annual reports are due each year by
  • What does RUSLE stand for?
  • What does NOI stand for in Permit Registration Documents?
  • Which CGP monitoring element is required for all risk levels?
  • SMARTS refers to
  • CSMP stands for
  • A paper copy of each Rain Event Action Plan (REAP) must be?
  • Revisions to add/reduce disturbed acreage must be filed electronically within how many days?
  • If the rainfall erosivity factor is 5 or above, what is required of the LRP?
  • For a corporation, the approved signatory on LRP documentation must be:
  • Under the CGP, a project's hydromodification requirements are superseded by
  • Which statement best describes sampling activities under CGP?
  • Visual Monitoring is required for which of the following?
  • Which BMP category should be used as the primary line of defense for erosion preventing?
  • Which is not called out as a phase of development in the General Permit?
  • Which term describes the deposition of material after erosion occurs?
  • CSMP and M&RP provide guidance for which combination of project types?
  • What factors are used for RUSLE
  • Which type of project SWPPP is explicitly stated to require Narrative BMPs?
  • Which phase is the final stage according to the permit's recognized phases?
  • What does NTU mean?
  • REAPs apply to Level 2 and 3 projects only
  • For Risk Level 3 site, receiving water monitoring is required when there is direct discharge to receiving waters and the effluent is outside the pH range of 6.0-9.0 or turbidity exceeds 500 NTU.
  • ATS instrumentation shall record which of the following?
  • Which condition must be met before a NOT can be submitted?
  • The statement bioassessment exemptions may be allowed for projects in ecoregions with an index period that is outside of construction commencement implies exemptions are allowed in what scenario?
  • Which option is not a primary BMP category for erosion prevention?
  • Mon-visible pollutant monitoring is triggered by the potential for non-visible pollutants to be discharged from any project site.
  • What does CASQA stand for?
  • WDID numbers are issued by which system?
  • Cable installation projects of more than 30 acres disturbed in project area or section designated as type 3 and directly discharging into receiving waters are subject to which following form of stormwater monitoring?
  • Each project utilizing ATS shall have a site-specific operation and maintenance manual.
  • Do type 1 LUPs typically have a high potential to impact storm water quality?
  • In the California Construction General Permit, Minimum BMPs refer to
  • Which is not an authorized non-storm water discharge source?
  • Waste containers must be covered at the end of each day and during rain events.
  • Which statement correctly describes ATS processing?
  • In RUSLE, the A factor is expressed as what units?
  • In the Revised Universal Soil Loss Equation (RUSLE), 'A' relates to
  • What is the primary federal law governing storm water pollution and regulation?
  • Which statement correctly describes the LRP signatory requirement?
  • What is the most common pollutant in runoff from construction sites?
  • CSMP stands for Construction Site Monitoring Program.
  • Which list contains all factors used in RUSLE?
  • What is the primary federal law governing storm water pollution and regulation?
  • Which item is explicitly listed as part of the PRDs?
  • Which unit is used to express turbidity in the context described?
  • Monitoring requirements for LUP and Traditional Projects are the same.
  • Before submitting a NOT, which condition must be satisfied?
  • What is the difference between erosion and sedimentation?
  • The LRP's approved signatory for the military must be:
  • Active Treatment Systems (ATS) are evaluated using which metric?
  • When does Risk Level 1 sampling have to occur?
  • Continuous monitoring of ATS is required at a minimum interval of what?
  • In the RUSLE equation, 'P' stands for
  • The CGP follows a risk-based permitting approach. The project risk level is calculated using:
  • A Compliance Storm Exemption may be available for what would otherwise be a NEL violation or RWMT.
  • In the RUSLE model, which factor is most typically determined by site-specific conditions rather than from regional maps?
  • Filed personnel in charge of ATA operations must complete how many hours of related training?
  • Amendments to the SWPPP are the responsibility of which party?
  • The 85th percentile in the context of water balance refers to which concept?
  • Which program’s protocols are used for Level 3 bioassessments?
  • Rainfall erosivity describes what?
  • The person in charge of the utility company, municipality, or other agency that owns or operates the ____ may also serve as the LRP.
  • The requirements for ATS are found in which attachment?
  • When would bioassessment sampling take place?
  • What is the primary responsibility of the Legally Responsible Person (LRP) under the CGP program?
  • Which unit is used to express turbidity in the context described?
  • Which construction activity is not covered under the CGP?
  • Which statement best describes the LRP for traditional construction projects?
  • How is coverage initiated under CGP?
  • The post-construction standards under CGP apply to which projects?
  • What is the minimum land disturbance in acres that triggers this permit?
  • All PDRs must be certified by which party?
  • The CGP follows a risk-based permitting approach. The project risk level is calculated using which two risks?
  • DSA stands for
  • All linear project SWPPPs must be developed to include Narrative BMPs which may or may not be drawn on a BMP map. Which option best represents this requirement?
  • Which term identifies erosion potential due to storm energy in rainfall data?
  • Soil roughness applied to a Disturbed Soil Area (DSA) tends to
  • Which method requires computational proof for demonstrating final stabilization under the GP?
  • If the rainfall erosivity factor reaches 5 or above, which action is triggered?
  • A non-storm water discharge observed during inspection is documented by filing which type of report?
  • Under the GP, is the Regional Water Board prohibited from asking sites to monitor additional parameters?
  • The CGP required the following monitoring elements for all risk levels.
  • SWAMP stands for
  • Dry weight of a solid material pertains to which analytical parameters?
  • What is the deadline for termination of CGP coverage after construction is complete or ownership is transferred?
  • Which statement best describes when receiving water monitoring is required for Risk Level 3 sites?
  • A NOT may be requested under the following conditions except:
  • RUSLE stands for
  • Unless otherwise noted, SWPPP documents are to be retained for
  • Which of the following is an example of erosion control?
  • RUSLE 2 computer modeling to demonstrate final stabilization will provide an estimate of soil loss in what units?
  • Which is most true about ATS
  • Submitting PRDs through SMARTS is allowed for which participant?
  • Which statement about Minimum BMPs is true?
  • In sire inspection reports for all risk level discharges, which weather information must be documented?
  • The Construction General Permit applies to which projects according to the scope of DWQ-2009-0009?
  • Bioassessment protocols for Level 3 projects must follow those found in which program?
  • Which hydrological soil group has the highest infiltration rate?
  • Which method demonstrates final stabilization other than the 70% final cover method or the RUSLE/RUSLE2 approach?
  • Which document contains the BMP requirements for Type 2 LUPs?
  • Where must records be available during construction?
  • Which factor(s) of RUSLE can be based on site-specific analysis rather than maps?
  • Natural products such as mulch used as seed do not need to be contained on site since they are biodegradable.
  • LUP stands for which type of projects?
  • Water balance (hydromodification) requirements are intended to manage pre-project storm volumes up to the ____ percentile
  • Which two RUSLE factors are typically influenced by land management practices and site-specific factors?
  • Which of the following is not a basis to demonstrate final stabilization?
  • What is the CGP-approved method for pH analysis?
  • Which of the following two factors are primary for making a risk determination?
  • Under CGP, hydromodification requirements can be superseded by which plan?
  • Records are required to remain onsite during the construction period for a minimum of ___.
  • The QSD's role includes which task?
  • During a routine inspection, if a non-storm water discharge is observed, what must be prepared?
  • 'R' factor in risk assessment will vary based on
  • RUSLE is an estimation of
  • Which construction activity is not covered under the CGP?
  • Turbidity is measured in
  • What term is used for land areas affected by construction that may require revisions to coverage?
  • Quarterly non-storm water discharge monitoring inspections are not required for which sites?
  • What is the primary role of Regional Water Boards in relation to the General Permit?
  • Which statement about RUSLE is true?
  • Historical data that can be used to demonstrate final stabilization includes
  • NPDES stands for?
  • Which statement about the Small Construction Rainfall Erosivity Waiver is true?
  • The BMP requirements for Type 2 LUPs are found in
  • Which statement correctly describes who may serve as the LRP?
  • Which two best represent an ATS 'mode of operation'?
  • For traditional construction projects the LRP may be:
  • Which role is primarily responsible for amendments to the SWPPP?
  • For each day of discharge from a qualifying event, the absolute minimum number of pH or turbidity effluent samples is
  • Risk Level 1 sampling is required for pollutants that are not visible. Which option represents this category?
  • In the permit context, what does GP abbreviate?
  • Which entity is the primary party responsible for obtaining and retaining forecast information from the National Weather Service?
  • What is the primary function of Active Treatment Systems (ATS) in stormwater management?
  • Sediment control BMPs are considered to be which type of measure?
  • What is the primary storm water pollutant at a construction site?
  • CASQA stands for which organization?
  • Bioassessment exemptions may be allowed for projects in ecoregions with an index period that is outside of which phase?
  • ATS monitoring always included all of the following except
  • Which of the following best describes a LUP Type 3 Site?
  • Are sediment control BMPs a primary or secondary means of preventing storm water contamination?
  • The distinct descriptors used to differentiate Traditional from LUP projects are
  • A discharger is considered covered by the CGP when____
  • Under the GP, a discharger may adjust the total acreage covered when which condition applies?
  • Inspection records have to be kept until the project is complete or three years whichever comes first.
  • Discharges eligible for Rainfall Erosivity Waiver must occur during periods when the rainfall erosivity factor is less than what value?
  • What is the civil penalty cap for a permit violation under the GP?
  • REAPS apply to
  • The K factor represents in RUSLE
  • All projects are subject to monitoring for which parameters
  • Are LUP projects subject to the post-construction standards in the CGP?
  • Bioassessment monitoring is an assessment of the number and diversity of benthic macroinvertebrates in a water body.
  • True or False: The CGP prohibits the Regional Water Board from asking sites to monitor other parameters.
  • When required, risk level 1 discharge sampling is conducted during which time frame?
  • Which entity is tasked to obtain and retain a printed copy of forecast information from the National Weather Service?
  • ATS projects require a site-specific operation and maintenance manual.
  • Who is responsible for identifying the monitoring locations in the SWPPP?
  • Which of the following is one of the four distinct phases recognized by the General Permit?
  • Which soil type is associated with the highest rate of infiltration into the soil?
  • Which action is explicitly part of construction or demolition activities that may trigger the land disturbance threshold?
  • The SWPPP shall be available?
  • Sheet, rill, and slide are terms used to describe forms of
  • In continuous ATS monitoring, what interval is required at minimum?
  • The CGP applies to which type of pollution discharges?
  • New owners of a permitted project must be notified of permit requirements by which entity?
  • When are erosion and sediment controls required?
  • Annual reports must contain all except
  • Authorized non-storm water discharges may include those from which source?
  • When does Risk Level 1 site have to sample?
  • Two terms that best describe the difference between Traditional and LUP projects are
  • Where must CGP termination filings be submitted?
  • Which site type does not require quarterly non-storm water discharge monitoring inspections?
  • Which statement about receiving water monitoring for Risk Level 3 sites is accurate?
  • The legally authorized signatory required to certify PDRs is known as?
  • Records related to LUPs may be retained in a crew member's vehicle and made available upon request. True or False?
  • All projects are subject to which type of monitoring
  • Bioassessment monitoring is the form used for cable installation projects over 30 acres with direct discharges into receiving waters.
  • Site Administrative Penalties for sediment-laden water can result in fines of how much per gallon?
  • When must pre-rain event inspections occur?
  • Which of the following is true?
  • If outside the pH and turbidity parameters, what action must the discharger take?
  • What is the pH range and turbidity limit for Risk Level 2 & 3?
  • Non-Stormwater reports are to be documented on what schedule?
  • Which factor(s) of RUSLE must be changed to recalculate risk when the construction duration has changed?
  • LUP projects can possibly have monitoring/reporting requirements for all except which item?
  • Which pair of risk factors is considered primary when evaluating potential environmental impact of stormwater?
  • ATS projects typically utilize which feature?
  • REAP refers to
  • CSMP and M&RP relate respectively to
  • The Small Construction Rainfall Erosivity Waiver applies to sites of what size?
  • When would receiving water monitoring occur?
  • Which monitoring element is described as being used "as needed" under the CGP?
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy